Pink Poppy Flowers

DOWNTOWN STADIUM

PROJECT DESCRIPTION

A 5,000 seat, open-air, stadium for Spokane Public Schools. Consisting of concrete footings and walls, masonry, metal framed walls, steel columns, steel beams and steel roof framing, totaling 427 tons of steel elements.

20230926_120504.jpg
20230926_115546.jpg

ITEMS SUPPLIED

structural steel and miscellaneous steel (including delegated design of stairs, guardrails, and handrails).

SURFACE COATING

Galvanizing, shop primer, powder-coating, and epoxy coating

CHALLENGES OVERCOME

Coordinated with multiple trades through BIM, email, virtual & in-person meetings ensuring successful integration of scope items, and navigated complications when tolerance accumulations between parties hindered installation.

20230926_115101.jpg

RENTON ES #16

PROJECT DESCRIPTION

Over 81 thousand square ft School.  Structural Steel framing with integrated Cross Laminated Timber members, and delegated design of steel & timber stairs and railing systems throughout the school.

ITEMS SUPPLIED

Structural steel, and Verco deck.

SURFACE COATING

Shop Primer

CHALLENGES OVERCOME

Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.

20230718_172552.jpg
20230718_170741.jpg
20230718_172150.jpg

King County Metro – Interim Base Electrification

PROJECT DESCRIPTION

120 Bus Charging Base. Complex coatings, specialty colors, and 100’-0 shipped 1-piece gantries

20251208_094535.jpg
20251208_094535.jpg
20240806_134300.jpg
20251208_095509.jpg

OVERVIEW

Project included site scanning, coordination with electricians for preinstallation here at Finnoe, proof of concept construction, specialty miscellaneous metals fabrication.

CHALLENGES OVERCOME

Complex 3D tower fabrication. We designed and built special stands to rotate the gantries like a rotisserie for painting.

JST Beach Pavilion

PROJECT DESCRIPTION

93-tons of structural steel with cruciform columns.

ITEMS SUPPLIED

Structural steel, and Verco deck.

SURFACE COATING

Shop Primer

CHALLENGES OVERCOME

Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.

20230718_172552.jpg
20230718_170741.jpg
20230718_172150.jpg