DOWNTOWN STADIUM
PROJECT DESCRIPTION
A 5,000 seat, open-air, stadium for Spokane Public Schools. Consisting of concrete footings and walls, masonry, metal framed walls, steel columns, steel beams and steel roof framing, totaling 427 tons of steel elements.


ITEMS SUPPLIED
structural steel and miscellaneous steel (including delegated design of stairs, guardrails, and handrails).
SURFACE COATING
Galvanizing, shop primer, powder-coating, and epoxy coating
CHALLENGES OVERCOME
Coordinated with multiple trades through BIM, email, virtual & in-person meetings ensuring successful integration of scope items, and navigated complications when tolerance accumulations between parties hindered installation.

RENTON ES #16
PROJECT DESCRIPTION
Over 81 thousand square ft School. Structural Steel framing with integrated Cross Laminated Timber members, and delegated design of steel & timber stairs and railing systems throughout the school.
ITEMS SUPPLIED
Structural steel, and Verco deck.
SURFACE COATING
Shop Primer
CHALLENGES OVERCOME
Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.



King County Metro – Interim Base Electrification
PROJECT DESCRIPTION
120 Bus Charging Base. Complex coatings, specialty colors, and 100’-0 shipped 1-piece gantries




OVERVIEW
Project included site scanning, coordination with electricians for preinstallation here at Finnoe, proof of concept construction, specialty miscellaneous metals fabrication.
CHALLENGES OVERCOME
Complex 3D tower fabrication. We designed and built special stands to rotate the gantries like a rotisserie for painting.
JST Beach Pavilion
PROJECT DESCRIPTION
93-tons of structural steel with cruciform columns.
ITEMS SUPPLIED
Structural steel, and Verco deck.
SURFACE COATING
Shop Primer
CHALLENGES OVERCOME
Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.