top of page
Pink Poppy Flowers

Chatcolet Marina

PROJECT DESCRIPTION

162 slip marina, fabricated steel dock frames, Aluminum gangways, fully assembled with float tubs and rub-strips

20251208_094535.jpg
Copy of PXL_20260521_204406271.jpg
20240806_134300.jpg
Copy of PXL_20260521_195339660.jpg

OVERVIEW

CHALLENGES OVERCOME

DOWNTOWN STADIUM

PROJECT DESCRIPTION

A 5,000 seat, open-air, stadium for Spokane Public Schools. Consisting of concrete footings and walls, masonry, metal framed walls, steel columns, steel beams and steel roof framing, totaling 427 tons of steel elements.

20230926_120504.jpg
20230926_115546.jpg

ITEMS SUPPLIED

structural steel and miscellaneous steel (including delegated design of stairs, guardrails, and handrails).

SURFACE COATING

Galvanizing, shop primer, powder-coating, and epoxy coating

CHALLENGES OVERCOME

Coordinated with multiple trades through BIM, email, virtual & in-person meetings ensuring successful integration of scope items, and navigated complications when tolerance accumulations between parties hindered installation.

20230926_115101.jpg

RENTON ES #16

PROJECT DESCRIPTION

Over 81 thousand square ft School.  Structural Steel framing with integrated Cross Laminated Timber members, and delegated design of steel & timber stairs and railing systems throughout the school.

ITEMS SUPPLIED

Structural steel, and Verco deck.

SURFACE COATING

Shop Primer

CHALLENGES OVERCOME

Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.

20230718_172552.jpg
20230718_170741.jpg
20230718_172150.jpg

JST Beach Pavilion

PROJECT DESCRIPTION

93-tons of structural steel with cruciform columns.

ITEMS SUPPLIED

Structural steel, and Verco deck.

SURFACE COATING

Shop Primer

CHALLENGES OVERCOME

Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.

20230718_172552.jpg
20230718_170741.jpg
20230718_172150.jpg
bottom of page