Chatcolet Marina
PROJECT DESCRIPTION
162 slip marina, fabricated steel dock frames, Aluminum gangways, fully assembled with float tubs and rub-strips




OVERVIEW
CHALLENGES OVERCOME
DOWNTOWN STADIUM
PROJECT DESCRIPTION
A 5,000 seat, open-air, stadium for Spokane Public Schools. Consisting of concrete footings and walls, masonry, metal framed walls, steel columns, steel beams and steel roof framing, totaling 427 tons of steel elements.


ITEMS SUPPLIED
structural steel and miscellaneous steel (including delegated design of stairs, guardrails, and handrails).
SURFACE COATING
Galvanizing, shop primer, powder-coating, and epoxy coating
CHALLENGES OVERCOME
Coordinated with multiple trades through BIM, email, virtual & in-person meetings ensuring successful integration of scope items, and navigated complications when tolerance accumulations between parties hindered installation.

RENTON ES #16
PROJECT DESCRIPTION
Over 81 thousand square ft School. Structural Steel framing with integrated Cross Laminated Timber members, and delegated design of steel & timber stairs and railing systems throughout the school.
ITEMS SUPPLIED
Structural steel, and Verco deck.
SURFACE COATING
Shop Primer
CHALLENGES OVERCOME
Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.



JST Beach Pavilion
PROJECT DESCRIPTION
93-tons of structural steel with cruciform columns.
ITEMS SUPPLIED
Structural steel, and Verco deck.
SURFACE COATING
Shop Primer
CHALLENGES OVERCOME
Cruciform column with extremely restricted welding access, requiring pre-coating the sub-assemblies before welding.